SK hynix is officially setting its sights on the next frontier of memory architecture, with plans to begin mass production of 3D DRAM by 2031. Choi Kang-sik, a Distinguished Engineer at the company, confirmed the timeline during the AI Semiconductor Forum at Seoul National University, noting that the roadmap could see production start as early as four to five years from now. This shift marks a fundamental departure from current high-bandwidth memory (HBM) solutions, which simply stack existing DRAM dies, requiring instead a complete overhaul of the underlying architecture and manufacturing process.
Scaling Beyond the 10nm Barrier
The push for 3D DRAM is driven by the need to surpass the density limits of current 10nm-class designs, such as 1c DRAM. SK hynix estimates that a 3D structure would need approximately 75 memory layers just to match the density of today's 1c DRAM. To ensure a significant leap in performance and capacity, the company is aiming for a 100-layer design for its first-generation 3D DRAM product. While current manufacturing equipment is capable of handling 100 layers, the industry faces a steeper climb to reach the 200 to 300-layer threshold, which will necessitate multi-deck stacking and specialized hybrid bonding techniques.
The Role of Hybrid Bonding and Xtacking
To achieve these complex vertical structures, SK hynix is expected to license Xtacking technology from the Chinese firm YMTC. This hybrid bonding method creates a permanent connection between two silicon chips using embedded metal bumps, allowing multiple dies or wafers to be joined by stacking their back ends together. Both SK hynix and Samsung are currently eyeing hybrid bonding as a critical path forward, not only for 3D DRAM but also as a potential method to advance 3D NAND production in the coming decade.